COST EFFECTIVE SOLUTIONS FOR UNDERGROUND CONSTRUCTION, UTILITY INFRASTRUCTURE, AND PIPELINE INDUSTRIES.
COST EFFECTIVE SOLUTIONS FOR UNDERGROUND CONSTRUCTION, UTILITY INFRASTRUCTURE, AND PIPELINE INDUSTRIES.
Whether connecting cities, commercial developments or expanding existing highway, Fama Equipment can generate a solution to get rock out of your way and your utility in the ground. Widths and depths are modeled to ensure you get the trenching exactly the way your project requires it.
Horizontal directional drilling (HDD) is a cost-effective alternative to open excavation and an essential tool in today’s environmentally sensitive construction industry. Whether it’s laying a utility distribution line under a major city or a transmission line under a sensitive wetland, minimal impact is our goal.
Fama Equipment has grown with the directional drilling industry to provide cutting-edge technology that eliminates guesswork, improves safety and ensures the most efficient job sites. Technology to drill developed areas without disturbing the surface is our specialty, and our team has the expertise to successfully complete the job.
We bring precision and pride of workmanship to every project, and our job sites are among the safest and most well organized in the industry. As soil and rock are extracted from the bore, they are quickly contained and removed. At every site, we operate within as tight a space as safety permits creating minimal disruption to traffic and neighborhoods.
Our horizontal directional drilling (HDD) supervisors have a minimum of 10 years’ experience with directional drilling techniques. Our employees are the best in the trenchless industry and bring a professional, positive attitude and driven work ethic to every job. Our team takes pride in overcoming challenges and solving problems We are dedicated to protecting the environment and operating in compliance with environmental regulations.
When we use HDD to install telecommunication lines or utility pipelines, our equipment has a small footprint, which means minimal disruption to traffic, create pilot holes to accommodate the conduit to bore pathway, then verify its position to complete the job and restore the worksite to its original condition.